Comments on 0418 950 176

Search Results for 0418 950 176

Names found on this computer

Carilla Hirings (wa)

Address

9 Snowball Rd, Kalamunda WA 6076, Australia

History

0 older records found on this number.

Phone Type

Digital Mobile Service

Latest Holder

Telstra Corporation Limited

Numbering Area

Unknown

Last Found

November 2005

Other Formats

0418950176
/0418-950-176
/0418950176
/0418 950 176
/004 189 50176
/+61418950176

Comments on 0418 950 176

Thanga

Posted on January 4, 2012
Caller type: Unknown
Location: Australia
Hi Adrian,

Refer our conversation regarding the above just now. As I mentioned that we are planning to remediate the contaminated soil stockpile(2 Nos) by latter part of March or April 2012. The duration of the job shall be 13 to 15 weeks.

The scope of the job shall be
1) Site preparation as per enclosed file (Muchea site layout).
It include levelling the site and constructs over size particle or sludge holding pond, treated soil holding pond and wastewater holding pond.
2) This wastewater holding pond need to have liner to hold the water. Lance St. Hill of Fabric solutions Australia Pty ltd (Tp :(07) 3807 0200) has quoted the suitable liner for us. You may work with him and buy the liner and help us to install it. the following is the exact dimension of wastewater holding pond.

15 m


1m 1m


9 m pit 1 m
(1 m x 1 m x 1 m) 10 m
13 m
depth 1 m


3 m
2 m


slope is vertical.

3) Information of contaminated soil remediation
Volume of the soil in both stockpiles -2100 m3. (see the picture)
Process : sieving  feed to HPC via hopper  chemical amendment  remove the treated soil from treated soil holding bond to stockpile area.

Capacity of the sieves 0.78 m3 and expected to sieves this volume in a minutes. Sieves Elevation is 2 m

Feed to HPC via hopper : sieved soil will be feed to hopper. Capacity of the hopper is 7m3 to 10 m3/hr.
Elevation is 3 to 3.5 m (by putting soil, we may also lift the front end loader feeding level to hopper)

Chemical amendment : mixed the soil in the treated soil holding bond (1 m depth) and mobilise the treated soil to the stockpile area.

Proposed schedule

weekly Time
No Description Max capacity wk1 wk2 wk3 wk4 wk5 wk6 wk7 wk8 wk9 wk10 wk11 wk12 wk13

1 Site preparation- ponds construction (1 wks)
2 Equipment set up and training (3 wks)
3 Sieving (2 wks) 1000 m3/wk
4 Particle separation (8 wks) 262 m3/wk 5 day 4 day 4 day 4 day 5 day 4 day 4 day 4 day
5 Soil amendment and soil mobilisation (2 wks) 1000 m3/wk 1 day 1 day 1 day 1 day 1 day 1 day 1 day 1 day
6 Site closure (1wks)





4) Site closure
Once the job over, we also need to closed the site. It closed the ponds etc.

Based on the above, could you please give us the following quotation.
1) Right equipments for this job and quotations (include equipment rental, operator and fuel)
2) Lining the wastewater treatment pond including material and labour
3) Site preparation and site closure cost

Regards,

K.Thanga,

Centre for Environmental Risk Assessment and Remediation
University of South Australia
X Building, Room X2, Mawson Lakes Campus
Mawson Lakes, South Australia, SA5095
AUSTRALIA
Ph: (08) 8302 3332 (W); 0430 056 933 (Mobile)
Fax: (08) 8302 3057
0 found this comment helpful
0

Do you have a comment about Carilla Hirings (wa) or 0418 950 176?

Do you have a comment about Carilla Hirings (wa) or 0418 950 176?